Difference between revisions of "Bee-Plane TRL 1"

From beeplane
Jump to navigation Jump to search
Line 1: Line 1:
 +
== TRLs ==
 +
[[Bee-Plane TRL 0 Year 2011]] : Studies started with TRL0 configuration (bi-plane) and ended with a new optimal configuration (one main wing).<BR>
 +
[[Bee-Plane TRL 2 Year 2013 ]] : Configuration selected during TRL1 is now used to prepare TRL2 studies.
 +
<BR>
 +
 +
== TRL1 ==
  
 
TRL 1 of Beeplane project occur in 2012.
 
TRL 1 of Beeplane project occur in 2012.
 
Four french engineering universities joined project and made first technical studies.<BR>
 
Four french engineering universities joined project and made first technical studies.<BR>
 
Tasks have been realized according to Lesser Open Bee License 1.2 [http://www.bee-license.com]<BR>
 
Tasks have been realized according to Lesser Open Bee License 1.2 [http://www.bee-license.com]<BR>
<BR>
 
 
''' TRLs '''<BR>
 
[[Bee-Plane TRL 0 Year 2011]] : Studies started with TRL0 configuration (bi-plane) and ended with a new optimal configuration (one main wing).<BR>
 
[[Bee-Plane TRL 2 Year 2013 ]] : Configuration selected during TRL1 is now used to prepare TRL2 studies.
 
 
<BR>
 
<BR>
  
Line 19: Line 20:
 
</gallery>
 
</gallery>
 
<BR>
 
<BR>
 +
 +
 +
 +
  
 
== Work Done ==
 
== Work Done ==

Revision as of 00:55, 21 July 2013

TRLs

Bee-Plane TRL 0 Year 2011 : Studies started with TRL0 configuration (bi-plane) and ended with a new optimal configuration (one main wing).
Bee-Plane TRL 2 Year 2013  : Configuration selected during TRL1 is now used to prepare TRL2 studies.

TRL1

TRL 1 of Beeplane project occur in 2012. Four french engineering universities joined project and made first technical studies.
Tasks have been realized according to Lesser Open Bee License 1.2 [1]

Initial drawings of TRL1




Work Done