Difference between revisions of "Bee-Plane TRL 1"

From beeplane
Jump to navigation Jump to search
m
m
Line 1: Line 1:
 +
Tasks have been realized according to Lesser Open Bee License 1.2 [http://www.bee-license.com]<BR>
 +
<BR>
 
'''TRLs'''<BR>
 
'''TRLs'''<BR>
 
[[Bee-Plane TRL 0 Year 2011]] : Studies started with TRL0 configuration (bi-plane) and ended with a new optimal configuration (one main wing).<BR>
 
[[Bee-Plane TRL 0 Year 2011]] : Studies started with TRL0 configuration (bi-plane) and ended with a new optimal configuration (one main wing).<BR>
Line 8: Line 10:
 
TRL 1 of Beeplane project occur in 2012 and was closed in March 2013.<BR>
 
TRL 1 of Beeplane project occur in 2012 and was closed in March 2013.<BR>
 
Four french engineering universities joined project and made first technical studies.<BR>
 
Four french engineering universities joined project and made first technical studies.<BR>
Tasks have been realized according to Lesser Open Bee License 1.2 [http://www.bee-license.com]<BR>
+
 
 
<BR>
 
<BR>
  

Revision as of 01:28, 21 July 2013

Tasks have been realized according to Lesser Open Bee License 1.2 [1]

TRLs
Bee-Plane TRL 0 Year 2011 : Studies started with TRL0 configuration (bi-plane) and ended with a new optimal configuration (one main wing).
Bee-Plane TRL 2 Year 2013  : Configuration selected during TRL1 is now used to prepare TRL2 studies.

TRL1

TRL 1 of Beeplane project occur in 2012 and was closed in March 2013.
Four french engineering universities joined project and made first technical studies.


Initial drawings of TRL1




Work Done