Difference between revisions of "Bee-Plane TRL 2"
Jump to navigation
Jump to search
Basket is design to be optimum for passengers frequent flight, then it is adapted to other usage (fret, hospitals...)
Basket with three pressure bubbles, Internal structure adapted to 3-3-3 seats configuration
Central luguage area for passenger basket (220 PAX full eco, 200 PAX in 2 classes), Only 1 central large main door for passengers on each side.
Basket with APU on the back, 4 electric directional wheels, additional fuel tanks in the basket
Bee
Flat surface bellow bee
1 pilot behind each other, or only 1 pilot, or even none.
Piot can not go from bee to basket (no internal ladder).
2 turbopropeller TP400 bellow main wings, 1 central turbofan on the back.
Variable inlet casing for rear turbofan, diameter of the turbofan = 1m.
Landing Gears and wings
Bi-taildragger configuration
Opposite "U" shape rear wings
Main landing gear with external rotation. Wheels goes behind Turboprop engines.
EM Normandy : Partnership strategy
SupMeca : Airport Studies
File:Rapport Projet Logistique.pdf
File:Présentation Projet Logistique.pdf

Projects already finished : February 2014
Estaca Laval 4A : Rear wings
File:Soutenance de projet Empennage Bee-Plane Tail 2013.pdf
File:Rapport de projet Bee-Plane 14 01 2014 vFinal Tail 2013.pdf
Estaca Laval 5A : Cabin Layout for full eco passengers basket
Estaca Laval 5A : Inboard Energies and engines review
Estaca Laval 5A : certification Part 21
Estaca Levallois 5A : certification Part 145
Projects in process : plan for march 2014
SupMeca : overall design studies and Collaborative projet
SupMeca : landing gear definition
File:File:Supmeca TP 2013 Poster.pdf
File:Supmeca TP 2013 Rapport Final.pdf
File:File:Supmeca TP 2013 Soutenance.pdf
SupMeca : airline economical impact
Project in process : plan for june 2014 Ecole Centrale Paris : AAS Analysis for Aircraft Sizing tool, and implement lateral flight stability calculation
IFMA Clermont : Rear landing gear,
IFMA Clermont : airport impact,
IFMA Clermont : attach system mechanical studies
Trinity College : Accoustic
Wiki.admin (talk | contribs) |
Wiki.admin (talk | contribs) |
||
Line 1: | Line 1: | ||
TRL 2 starts in 2013. It is planned to have a 2 years duration.<BR> | TRL 2 starts in 2013. It is planned to have a 2 years duration.<BR> | ||
− | Projet and tasks are | + | Projet and tasks are achieved according to [http://www.bee-license.com Lesser Open Bee License 1.3]<BR> |
<BR> | <BR> | ||
[[Bee-Plane TRL 1 Year 2012]] : Aeronautical configuration to be studied in details is resulting from TRL1.<BR> | [[Bee-Plane TRL 1 Year 2012]] : Aeronautical configuration to be studied in details is resulting from TRL1.<BR> | ||
Line 41: | Line 41: | ||
<BR><BR> | <BR><BR> | ||
'''Bee'''<BR> | '''Bee'''<BR> | ||
− | <LI>Flat surface bellow bee | + | <LI>Flat surface bellow bee |
<LI>1 pilot behind each other, or only 1 pilot, or even none. | <LI>1 pilot behind each other, or only 1 pilot, or even none. | ||
<LI>Piot can not go from bee to basket (no internal ladder). | <LI>Piot can not go from bee to basket (no internal ladder). | ||
<LI>2 turbopropeller TP400 bellow main wings, 1 central turbofan on the back. | <LI>2 turbopropeller TP400 bellow main wings, 1 central turbofan on the back. | ||
− | <LI>Variable inlet casing for rear turbofan | + | <LI>Variable inlet casing for rear turbofan, diameter of the turbofan = 1m.<BR> |
'''Landing Gears and wings'''<BR> | '''Landing Gears and wings'''<BR> | ||
<LI>Bi-taildragger configuration<BR> | <LI>Bi-taildragger configuration<BR> | ||
<LI>Opposite "U" shape rear wings<BR> | <LI>Opposite "U" shape rear wings<BR> | ||
<LI>Main landing gear with external rotation. Wheels goes behind Turboprop engines.<BR> | <LI>Main landing gear with external rotation. Wheels goes behind Turboprop engines.<BR> | ||
− | + | <BR> | |
== Studies == | == Studies == | ||
− | Studies | + | Studies of the TRL2 includes<BR> |
- Configuration definition | - Configuration definition | ||
- Aerodynamic | - Aerodynamic | ||
- Mechanical | - Mechanical | ||
− | - Accoustic | + | - Accoustic diagnostic |
+ | - Economical studies | ||
+ | - Certification requierements | ||
<BR> | <BR> | ||
<BR> | <BR> | ||
* [[Bee-Plane Passenger Floor Plan]] | * [[Bee-Plane Passenger Floor Plan]] | ||
* [[Hospital basket]]<BR> | * [[Hospital basket]]<BR> | ||
− | <BR> | + | <BR><BR> |
− | '''Projects already finished | + | '''Projects already finished : june 2013'''<BR> |
<li> EM Normandy : Partnership strategy | <li> EM Normandy : Partnership strategy | ||
<li> SupMeca : [[Airport Studies]]<BR> | <li> SupMeca : [[Airport Studies]]<BR> | ||
Line 69: | Line 71: | ||
[[File:Supmeca Logistique 2013 Poster Bee-Plane.jpg|300px]]<BR> | [[File:Supmeca Logistique 2013 Poster Bee-Plane.jpg|300px]]<BR> | ||
<BR> | <BR> | ||
+ | '''Projects already finished : February 2014'''<BR> | ||
+ | <LI> Estaca Laval 4A : Rear wings<BR> | ||
+ | [[File:Soutenance de projet Empennage Bee-Plane Tail 2013.pdf]]<BR> | ||
+ | [[File:Rapport de projet Bee-Plane 14 01 2014 vFinal Tail 2013.pdf]]<BR> | ||
+ | <BR> | ||
+ | <li> Estaca Laval 5A : Cabin Layout for full eco passengers basket<BR> | ||
+ | <li> Estaca Laval 5A : Inboard Energies and engines review<BR> | ||
+ | <li> Estaca Laval 5A : certification Part 21<BR> | ||
+ | <li> Estaca Levallois 5A : certification Part 145<BR> | ||
+ | '''Projects in process : plan for march 2014'''<BR> | ||
<LI> SupMeca : overall design studies and [[Collaborative projet]] | <LI> SupMeca : overall design studies and [[Collaborative projet]] | ||
Line 78: | Line 90: | ||
[[File:File:Supmeca TP 2013 Soutenance.pdf]]<BR> | [[File:File:Supmeca TP 2013 Soutenance.pdf]]<BR> | ||
<BR> | <BR> | ||
− | <LI> | + | <LI> SupMeca : airline economical impact<BR> |
− | + | ||
− | + | '''Project in process : plan for june 2014 ''' | |
− | |||
− | ''' | ||
<li> Ecole Centrale Paris : [[AAS Analysis for Aircraft Sizing]] tool, and implement lateral flight stability calculation<BR> | <li> Ecole Centrale Paris : [[AAS Analysis for Aircraft Sizing]] tool, and implement lateral flight stability calculation<BR> | ||
− | <li> | + | <li> IFMA Clermont : Rear landing gear, |
− | <li> | + | <li> IFMA Clermont : airport impact, |
− | <li> IFMA Clermont : | + | <li> IFMA Clermont : attach system mechanical studies<BR> |
− | <li> Trinity College : Accoustic | + | <li> Trinity College : Accoustic<BR> |
<BR> | <BR> | ||
− | |||
− | |||
− |
Revision as of 12:05, 8 February 2014
TRL 2 starts in 2013. It is planned to have a 2 years duration.
Projet and tasks are achieved according to Lesser Open Bee License 1.3
Bee-Plane TRL 1 Year 2012 : Aeronautical configuration to be studied in details is resulting from TRL1.
TRL2 Project Overview
Project description at beginning of TRL2 :
- Project overview
- Light numerical mock-up : Bee-Plane Google Sketchup
- FP7 Submission file : File:BeePlane PartB Proposal v2.pdf will be presented again in Horizon 2020.
Additional documentation and numerical mock-up
All technical work done according to the open source paragraph of the Lesser Open Bee License 1-3 is available within a dedicated IT server. Access is provide on request.
Guidelines
Basket
Bee
Landing Gears and wings
Studies
Studies of the TRL2 includes
- Configuration definition
- Aerodynamic
- Mechanical
- Accoustic diagnostic
- Economical studies
- Certification requierements
Projects already finished : june 2013
File:Rapport Projet Logistique.pdf
File:Présentation Projet Logistique.pdf

Projects already finished : February 2014
File:Soutenance de projet Empennage Bee-Plane Tail 2013.pdf
File:Rapport de projet Bee-Plane 14 01 2014 vFinal Tail 2013.pdf
Projects in process : plan for march 2014
File:File:Supmeca TP 2013 Poster.pdf
File:Supmeca TP 2013 Rapport Final.pdf
File:File:Supmeca TP 2013 Soutenance.pdf
Project in process : plan for june 2014