Difference between revisions of "Bee-Plane TRL 1"

From beeplane
Jump to navigation Jump to search
m (Wiki.admin moved page Bee-Plane TRL 1 Year 2012 to Bee-Plane TRL 1 without leaving a redirect)
m
Line 1: Line 1:
 
Tasks have been realized according to Lesser Open Bee License 1.2 [http://www.bee-license.com]<BR>
 
Tasks have been realized according to Lesser Open Bee License 1.2 [http://www.bee-license.com]<BR>
 +
Partners of TRL1 are : Ecole Centrale Paris, ESTACA Laval, INSA Rouen, IPSA<BR>
 
<BR>
 
<BR>
 
'''TRLs'''<BR>
 
'''TRLs'''<BR>

Revision as of 12:48, 8 February 2014

Tasks have been realized according to Lesser Open Bee License 1.2 [1]
Partners of TRL1 are : Ecole Centrale Paris, ESTACA Laval, INSA Rouen, IPSA

TRLs
Bee-Plane TRL 0 : Studies started with TRL0 configuration (bi-plane) and ended with a new optimal configuration (one main wing).
Bee-Plane TRL 2 : Configuration selected during TRL1 is now used to prepare TRL2 studies.

Fundings
A FP7 file was submitted at end of TRL1 : File:BeePlane PartB Proposal v2.pdf
Project passed first stage and was not selected at the end. It will be presented again in Horizon 2020 at beginning of TRL2.

TRL1

TRL 1 of Beeplane project occur in 2012 and was closed in March 2013.
Four french engineering universities joined project and made first technical studies.


Initial drawings of TRL1




Work Done