Difference between revisions of "Bee-Plane TRL 1"

From beeplane
Jump to navigation Jump to search
Line 5: Line 5:
 
[[Bee-Plane TRL 2 Year 2013 ]] : Configuration selected during TRL1 is now used to prepare TRL2 studies.
 
[[Bee-Plane TRL 2 Year 2013 ]] : Configuration selected during TRL1 is now used to prepare TRL2 studies.
 
<BR>
 
<BR>
A FP7 file was submitted at end of TRL1 : [[File:BeePlane PartB Proposal v2.pdf]] It will be presented again in Horizon 2020 at beginning of TRL2.
+
 
 +
'''Fundings'''<BR>
 +
A FP7 file was submitted at end of TRL1 : [[File:BeePlane PartB Proposal v2.pdf]]<BR>
 +
Project passed first stage and was not selected at the end. It will be presented again in Horizon 2020 at beginning of TRL2.
 
<BR>
 
<BR>
  

Revision as of 11:10, 8 February 2014

Tasks have been realized according to Lesser Open Bee License 1.2 [1]

TRLs
Bee-Plane TRL 0 Year 2011 : Studies started with TRL0 configuration (bi-plane) and ended with a new optimal configuration (one main wing).
Bee-Plane TRL 2 Year 2013  : Configuration selected during TRL1 is now used to prepare TRL2 studies.

Fundings
A FP7 file was submitted at end of TRL1 : File:BeePlane PartB Proposal v2.pdf
Project passed first stage and was not selected at the end. It will be presented again in Horizon 2020 at beginning of TRL2.

TRL1

TRL 1 of Beeplane project occur in 2012 and was closed in March 2013.
Four french engineering universities joined project and made first technical studies.


Initial drawings of TRL1